DlSCHARGE PIPEWORK (for
recommended pipe sizes see below)
All
units will pump
HORIZONTALLY or
VERTICALLY or
a combination.
1.
The UNITS
are NOT designed to pump LEVEL or
UPHILL.
i.e.
CANNOT pump on an UPHILL
GRADIENT away from the machine.
2.
After any initial “VERTICAL” lift, the discharge
pipework MUST NOT then lift again anywhere in the run.
3. All
“VERTICAL” lifts must begin within 300mm of the
unit and MUST PRECEDE any “HORIZONTAL” run.
4.
All “HORIZONTAL” runs must have a minimum 1 in
100 (10mm per Metr